United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESCompleted queue projects in ISO-NE (New England) (2017 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Three Corners Solar Solar |
110 MW | |
| University Solar Solar |
31.3 MW | |
| Johnston Landfill Wind Onshore wind |
21.0 MW | |
| Silver Maple Wind Onshore wind |
20.0 MW | |
| Solar Solar |
16.3 MW | |
| RoxWind Onshore wind |
15.3 MW | |
| Alton Solar Solar |
13.9 MW | |
| Solar Solar |
8.0 MW | |
| Solar Solar |
6.0 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- Southeast (non-ISO utilities)82 Β· 8,124 MW
- ERCOT (Texas)40 Β· 7,316 MW
- MISO (Midcontinent)33 Β· 5,494 MW
- West (non-ISO utilities)46 Β· 3,321 MW
- PJM (Mid-Atlantic, Midwest)72 Β· 3,127 MW
- SPP (Southwest Power Pool)13 Β· 1,934 MW
- CAISO (California)9 Β· 1,239 MW
- NYISO (New York)12 Β· 598 MW
- ISO-NE (New England)9 Β· 242 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)