United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESCompleted queue projects in ERCOT (Texas) (2012 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Bac Gas Β· PHR Holdings |
390 MW | |
| Ector County Energy Center G Gas Β· Invenergy |
341 MW | |
| Jumbo Road Wind Onshore wind Β· TX Jumbo Road Wind, LLC |
300 MW | |
| BTE (Baytown Chiller) Gas Β· Calpine |
270 MW | |
| Goodnight Wind Onshore wind Β· FGE Goodnight I, LLC |
258 MW | |
| Redgate G Gas Β· STEC |
225 MW | |
| Panhandle Wind 1 Onshore wind Β· Pattern Panhandle Wind, LLC |
218 MW | |
| Logans Gap Wind I Onshore wind Β· Pattern Energy |
211 MW | |
| South Plains I Onshore wind Β· SunEdison |
200 MW | |
| Hereford Wind Onshore wind Β· EDF Renewables |
200 MW | |
| Longhorn North Onshore wind Β· EDF Renewables |
200 MW | |
| Los Vientos III Onshore wind Β· Duke Energy |
200 MW | |
| Panhandle Wind 2 Onshore wind Β· Pattern Panhandle Wind 2, LLC |
182 MW | |
| Spinning Spur Wind Two Onshore wind Β· Cielo Wind Services |
161 MW | |
| Fluvanna Onshore wind Β· Terna Energy |
155 MW | |
| South Plains II Phase a Onshore wind Β· SunEdison |
152 MW | |
| Route 66 Wind Onshore wind Β· First Wind |
150 MW | |
| South Plains II Phase b Onshore wind Β· SunEdison |
149 MW | |
| Fegc Gas Β· Friendswood Energy Genco |
129 MW | |
| Los Vientos V Onshore wind Β· Duke Energy |
110 MW | |
| Windthorst 2 Onshore wind Β· OwnEnergy |
65.0 MW | |
| OCI Alamo 1 Solar Β· OCI Alamo 1 LLC |
50.0 MW | |
| OCI Alamo 4 (Brackettville / ECLIPSE) Solar Β· OCI Solar Power LLC |
38.0 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- PJM (Mid-Atlantic, Midwest)48 Β· 5,899 MW
- ERCOT (Texas)23 Β· 4,354 MW
- West (non-ISO utilities)49 Β· 2,322 MW
- SPP (Southwest Power Pool)17 Β· 1,712 MW
- MISO (Midcontinent)7 Β· 1,087 MW
- NYISO (New York)12 Β· 1,080 MW
- ISO-NE (New England)8 Β· 802 MW
- CAISO (California)5 Β· 440 MW
- Southeast (non-ISO utilities)7 Β· 218 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)