United States β€Ί Grid β€Ί Interconnection queues

GAS Β· ERCOT

Bac

Bac is a 390 MW gas request built and operating in the ERCOT interconnection queue.

Queue statusOperating
  1. PlanningQueued Oct 2012 (completed)
  2. ConsentedJan 2014 (completed)
  3. Construction (completed)
  4. OperatingJul 2018 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
14INR0038
Grid region
ERCOT (Texas)
Developer
PHR Holdings
Connection point (POI)
111132-7 BAC 13.8kV
Technology
Gas: 390 MW
Total requested
390 MW
Study phase
IA
Queue status
Operational
Entered queue
24 October 2012
Agreement signed
21 January 2014
Proposed online date
December 2018
Came online
July 2018

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem