United States βΊ Grid βΊ Interconnection queues
SOLAR Β· ERCOTOCI Alamo 4 (Brackettville / ECLIPSE)
OCI Alamo 4 (Brackettville / ECLIPSE) is a 38.0 MW solar request built and operating in the ERCOT interconnection queue.
Request details
- Queue ID
- 14INR0024
- Grid region
- ERCOT (Texas)
- Developer
- OCI Solar Power LLC
- Technology
- Solar: 38.0 MW
- Total requested
- 38.0 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 8 March 2012
- Agreement signed
- 7 January 2014
- Proposed online date
- August 2014
- Came online
- August 2014
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem