OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in CAISO (California) (2020 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Potentia-Viridi Other |
1,225 MW | Agreement signed |
| Windwalker Offshore Offshore wind |
1,029 MW | Agreement signed |
| Grace Energy Center Solar + storage |
1,017 MW | Agreement signed |
| Arida 3 Solar Farm Solar + storage |
900 MW | In study |
| Purple Sage Energy Center Solar + storage |
817 MW | Agreement signed |
| Steel City Battery Storage Battery storage |
675 MW | Agreement signed |
| Sunrise Power Improvement Gas |
656 MW | In study |
| Willow Rock Energy Storage Other |
620 MW | Agreement signed |
| Harquahala Sunrise Solar + storage |
618 MW | In study |
| Sanborn 5 Hybrid Solar |
560 MW | Agreement signed |
| Cobalt Solar + storage |
513 MW | Agreement signed |
| Calvada Springs Solar Solar + storage |
500 MW | Agreement signed |
| Hawkins Solar Hybrid Solar + storage |
500 MW | In study |
| Shoals Energy Storage Battery storage |
409 MW | Agreement signed |
| Rough Hat 2 Solar + storage |
408 MW | Agreement signed |
| Sequoia Solar + storage |
400 MW | In study |
| Rexford 2 Solar Farm Solar + storage |
400 MW | Agreement signed |
| Water Rock Solar 1 Solar + storage |
400 MW | Agreement signed |
| Dateland Energy Complex Solar + storage |
350 MW | Agreement signed |
| Roadhouse Storage Battery storage |
313 MW | Agreement signed |
| East Field Energy Storage Battery storage |
313 MW | Agreement signed |
| Winston Hybrid PV And BESS Solar + storage |
306 MW | Agreement signed |
| Overnight Solar Solar + storage |
300 MW | Agreement signed |
| Desert Sands Battery storage |
300 MW | Agreement signed |
| Bellefield 3 Solar Farm Solar + storage |
300 MW | Agreement signed |
| Captiva Energy Storage Battery storage |
257 MW | Agreement signed |
| Delamar Energy Storage Battery storage |
256 MW | Agreement signed |
| Commerce Energy Storage 2 Battery storage |
250 MW | In study |
| Sapphire Solar Solar + storage |
234 MW | Agreement signed |
| Puff Hybrid Solar Solar + storage |
204 MW | In study |
| Conaway Hybrid Power Plant Solar + storage |
170 MW | In study |
| Zeta Solar + storage |
155 MW | Agreement signed |
| Crystal Flats Solar + storage |
155 MW | Agreement signed |
| Segs Expansion 2 Hybrid Solar + storage |
145 MW | Agreement signed |
| Saddle Mountain Solar Solar |
125 MW | Agreement signed |
| Gonzaga Hybrid Wind + storage |
115 MW | Agreement signed |
| Denali Energy Storage Battery storage |
102 MW | Agreement signed |
| Keyhole Wind Onshore wind |
100 MW | Agreement signed |
| Sanborn Hybrid 4 Solar + storage |
100 MW | Agreement signed |
| Rosemary Solar + storage |
72.3 MW | Agreement signed |
| Scafell Storage Battery storage |
52.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)108 Β· 26.4 GW
- West (non-ISO utilities)100 Β· 24.5 GW
- PJM (Mid-Atlantic, Midwest)178 Β· 16.6 GW
- CAISO (California)41 Β· 16.3 GW
- MISO (Midcontinent)95 Β· 15.7 GW
- SPP (Southwest Power Pool)35 Β· 8,165 MW
- Southeast (non-ISO utilities)55 Β· 7,020 MW
- NYISO (New York)19 Β· 2,230 MW
- ISO-NE (New England)4 Β· 129 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)