United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in CAISO (California) (2016 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown133,530 MW
Active in queue3,530 MW13 requests
Agreement signed3,510 MW12 requests
Withdrawn9619.6 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

13 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Daylight
Solar + storage
611 MWAgreement signed Kings, CACAISO May 2016target 2028
Daggett Solar 3
Solar + storage
522 MWAgreement signed San Bernardino, CACAISO May 2016target 2023
Pluot
Solar + storage
479 MWAgreement signed Kings, CACAISO May 2016target 2026
Pomegranate
Solar + storage
479 MWAgreement signed Kings, CACAISO May 2016target 2025
Corby
Battery storage
314 MWAgreement signed Solano, CACAISO May 2016target 2027
Roccasecca BESS
Battery storage
303 MWAgreement signed Clark, NVCAISO May 2016target 2026
Tahoe
Battery storage
300 MWAgreement signed Clark, NVCAISO May 2016target 2026
Pastoria Solar
Solar + storage
187 MWAgreement signed Kern, CACAISO May 2016target 2026
Mulqueeney Ranch Wind
Onshore wind
114 MWAgreement signed Alameda, CACAISO May 2016target 2026
Kyan Solar
Solar
102 MWAgreement signed Kern, CACAISO May 2016target 2027
Solar Star 4
Solar + storage
50.0 MWAgreement signed Kern, CACAISO May 2016target 2026
Solar Star 3
Solar + storage
50.0 MWAgreement signed Kern, CACAISO May 2016target 2026
Agua Caliente Solar 2
Solar
20.0 MWIn study Maricopa, AZCAISO Mar 2016target 2016

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)