OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in CAISO (California) (2015 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Scarlet Solar + storage |
800 MW | Agreement signed |
| Antelope Solar 2 Solar + storage |
782 MW | Agreement signed |
| Aratina Solar Center 1 Solar + storage |
400 MW | Agreement signed |
| Sienna Solar Farm Solar + storage |
400 MW | Agreement signed |
| Luna Valley Solar Solar + storage |
373 MW | Agreement signed |
| Fountain Wind Onshore wind |
206 MW | Agreement signed |
| Little Bear 4 Solar + storage |
203 MW | Agreement signed |
| Big Rock Solar Farm Battery storage |
200 MW | Agreement signed |
| Leconte Energy Storage Battery storage |
125 MW | Agreement signed |
| Golden Fields Solar Battery storage |
100 MW | Agreement signed |
| Willow Springs Solar 4 Battery storage |
75.0 MW | Agreement signed |
| Fallbrook Energy Storage Battery storage |
69.6 MW | Agreement signed |
| Little Bear 3 Solar + storage |
40.4 MW | Agreement signed |
| Lake Alpaugh Battery Storage Battery storage |
10.0 MW | Agreement signed |
| Altamont Midway LTD Onshore wind |
5.0 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- CAISO (California)15 Β· 3,789 MW
- West (non-ISO utilities)21 Β· 3,582 MW
- ERCOT (Texas)13 Β· 3,101 MW
- PJM (Mid-Atlantic, Midwest)7 Β· 2,928 MW
- NYISO (New York)4 Β· 910 MW
- MISO (Midcontinent)8 Β· 688 MW
- Southeast (non-ISO utilities)3 Β· 619 MW
- SPP (Southwest Power Pool)1 Β· 220 MW
- ISO-NE (New England)1 Β· 1.4 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)