Interconnection queue in CAISO (California) (2015 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown153,789 MW
Active in queue3,789 MW15 requests
Agreement signed3,789 MW15 requests
Withdrawn9112.3 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

15 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Scarlet
Solar + storage
800 MWAgreement signed Fresno, CACAISO Apr 2015target 2025
Antelope Solar 2
Solar + storage
782 MWAgreement signed Los Angeles, CACAISO Apr 2015target 2025
Aratina Solar Center 1
Solar + storage
400 MWAgreement signed San Bernardino, CACAISO Apr 2015target 2026
Sienna Solar Farm
Solar + storage
400 MWAgreement signed San Bernardino, CACAISO Apr 2015target 2027
Luna Valley Solar
Solar + storage
373 MWAgreement signed Fresno, CACAISO Apr 2015target 2028
Fountain Wind
Onshore wind
206 MWAgreement signed Shasta, CACAISO Apr 2015target 2027
Little Bear 4
Solar + storage
203 MWAgreement signed Fresno, CACAISO Apr 20152020
Big Rock Solar Farm
Battery storage
200 MWAgreement signed Imperial, CACAISO Apr 2015target 2025
Leconte Energy Storage
Battery storage
125 MWAgreement signed Imperial, CACAISO Apr 2015target 2026
Golden Fields Solar
Battery storage
100 MWAgreement signed Kern, CACAISO Apr 2015target 2026
Willow Springs Solar 4
Battery storage
75.0 MWAgreement signed Kern, CACAISO Apr 2015target 2026
Fallbrook Energy Storage
Battery storage
69.6 MWAgreement signed San Diego, CACAISO Apr 2015target 2026
Little Bear 3
Solar + storage
40.4 MWAgreement signed Fresno, CACAISO Apr 20152020
Lake Alpaugh Battery Storage
Battery storage
10.0 MWAgreement signed Tulare, CACAISO Apr 2015target 2026
Altamont Midway LTD
Onshore wind
5.0 MWAgreement signed Alameda, CACAISO Apr 2015target 2027

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)