United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Battery storage interconnection queue in CAISO (California)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown17548.7 GW
Active in queue48.7 GW175 requests
Agreement signed22.9 GW85 requests
Withdrawn579141.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

175 requests Β· page 1 of 4
ProjectCapacityStatusLocationRegionQueuedOnline
Pion
Battery storage
1,168 MWIn study Fresno, CACAISO Apr 2023target 2028
Hillside Energy Storage
Battery storage
1,065 MWIn study Los Angeles, CACAISO Apr 2023target 2029
Crusade
Battery storage
1,029 MWIn study Orange, CACAISO Apr 2023target 2028
Lagoonez
Battery storage
1,029 MWIn study Los Angeles, CACAISO Apr 2023target 2028
Irving Storage
Battery storage
783 MWAgreement signed Monterey, CACAISO May 2019target 2025
Menifee Power Bank
Battery storage
680 MWAgreement signed Riverside, CACAISO Apr 2019target 2025
Steel City Battery Storage
Battery storage
675 MWAgreement signed Contra Costa, CACAISO Apr 2020target 2029
Yuha Desert Battery Storage
Battery storage
633 MWIn study Imperial, CACAISO Apr 2021target 2031
Sagebrush Energy Storage
Battery storage
528 MWIn study Kern, CACAISO Apr 2021target 2033
Summit Valley Energy Storage
Battery storage
519 MWIn study San Bernardino, CACAISO Apr 2023target 2032
Lupine Energy Center
Battery storage
518 MWIn study San Bernardino, CACAISO Apr 2023target 2030
Chronos Energy Storage
Battery storage
517 MWIn study San Bernardino, CACAISO Apr 2023target 2031
Alta Casa Storage
Battery storage
515 MWAgreement signed San Joaquin, CACAISO Apr 2021target 2031
Yacht Rock
Battery storage
514 MWIn study San Bernardino, CACAISO Apr 2023target 2028
Dove Cove
Battery storage
514 MWIn study San Joaquin, CACAISO Apr 2023target 2031
Belterra Energy Storage
Battery storage
514 MWIn study Calaveras, CACAISO Apr 2023target 2028
Fontus
Battery storage
514 MWIn study San Bernardino, CACAISO Apr 2023target 2031
Greasewood Energy Storage
Battery storage
513 MWAgreement signed Kern, CACAISO Apr 2021target 2033
Conduit Energy Storage
Battery storage
513 MWAgreement signed San Bernardino, CACAISO Apr 2021target 2031
Rosa Storage
Battery storage
512 MWIn study Ventura, CACAISO Apr 2021target 2034
Lock Storage
Battery storage
508 MWAgreement signed Fresno, CACAISO Apr 2021target 2027
Double Butte Storage
Battery storage
508 MWAgreement signed Riverside, CACAISO Apr 2019target 2030
Galicia Storage
Battery storage
506 MWIn study San Bernardino, CACAISO Apr 2023target 2028
Ambar Energy Storage
Battery storage
505 MWIn study San Bernardino, CACAISO Apr 2023target 2030
Drifter Energy Storage
Battery storage
505 MWAgreement signed Ventura, CACAISO Apr 2021target 2033
Spectrum Energy Storage
Battery storage
504 MWAgreement signed Alameda, CACAISO Apr 2021target 2032
Delilah Energy Storage
Battery storage
504 MWAgreement signed Contra Costa, CACAISO Apr 2021target 2032
Lake Elsinore Advanced Pumped Storage Project
Battery storage
500 MWAgreement signed Riverside, CACAISO Jun 2005target 2028
Goldback Solar Center
Battery storage
500 MWAgreement signed Ventura, CACAISO Apr 2019target 2026
Corby 2
Battery storage
476 MWIn study Solano, CACAISO Apr 2021target 2031
Shoals Energy Storage 2
Battery storage
461 MWIn study Los Angeles, CACAISO Apr 2023target 2029
Tolenas
Battery storage
417 MWIn study Solano, CACAISO Apr 2021target 2031
Dos Palmas
Battery storage
411 MWAgreement signed San Bernardino, CACAISO Apr 2021target 2031
Shoals Energy Storage
Battery storage
409 MWAgreement signed Ventura, CACAISO Apr 2020target 2030
Hidalgo Energy Storage
Battery storage
408 MWAgreement signed San Bernardino, CACAISO Apr 2021target 2033
Simon
Battery storage
406 MWIn study Los Angeles, CACAISO Apr 2021target 2032
Gabriel Storage
Battery storage
406 MWAgreement signed Los Angeles, CACAISO Apr 2021target 2033
Trolley
Battery storage
406 MWAgreement signed San Bernardino, CACAISO Apr 2021target 2031
Coral Reef
Battery storage
406 MWIn study Los Angeles, CACAISO Apr 2021target 2032
Fleetwood
Battery storage
406 MWIn study Los Angeles, CACAISO Apr 2021target 2032
Marici
Battery storage
406 MWAgreement signed Los Angeles, CACAISO Apr 2021target 2031
Tea Leaf Energy Storage
Battery storage
404 MWIn study Alameda, CACAISO Apr 2023target 2030
Dirac
Battery storage
403 MWIn study San Bernardino, CACAISO Apr 2021target 2031
Brushy
Battery storage
400 MWIn study Solano, CACAISO Apr 2021target 2031
Golden Flats
Battery storage
365 MWAgreement signed Stanislaus, CACAISO Apr 2021target 2031
Espresso
Battery storage
365 MWAgreement signed Alameda, CACAISO Apr 2021target 2031
Northeast Central Valley
Battery storage
365 MWIn study San Joaquin, CACAISO Apr 2021target 2031
Jewelflower Storage
Battery storage
355 MWAgreement signed Santa Clara, CACAISO Apr 2019target 2029
Allegheny Energy Storage
Battery storage
353 MWAgreement signed Contra Costa, CACAISO Apr 2021target 2032
Moonraker
Battery storage
353 MWIn study Kern, CACAISO Apr 2023target 2029
Page 1 of 4

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)