| Project | Capacity | Status |
|---|---|---|
| Pion Battery storage |
1,168 MW | In study |
| Hillside Energy Storage Battery storage |
1,065 MW | In study |
| Crusade Battery storage |
1,029 MW | In study |
| Lagoonez Battery storage |
1,029 MW | In study |
| Irving Storage Battery storage |
783 MW | Agreement signed |
| Menifee Power Bank Battery storage |
680 MW | Agreement signed |
| Steel City Battery Storage Battery storage |
675 MW | Agreement signed |
| Yuha Desert Battery Storage Battery storage |
633 MW | In study |
| Sagebrush Energy Storage Battery storage |
528 MW | In study |
| Summit Valley Energy Storage Battery storage |
519 MW | In study |
| Lupine Energy Center Battery storage |
518 MW | In study |
| Chronos Energy Storage Battery storage |
517 MW | In study |
| Alta Casa Storage Battery storage |
515 MW | Agreement signed |
| Yacht Rock Battery storage |
514 MW | In study |
| Dove Cove Battery storage |
514 MW | In study |
| Belterra Energy Storage Battery storage |
514 MW | In study |
| Fontus Battery storage |
514 MW | In study |
| Greasewood Energy Storage Battery storage |
513 MW | Agreement signed |
| Conduit Energy Storage Battery storage |
513 MW | Agreement signed |
| Rosa Storage Battery storage |
512 MW | In study |
| Lock Storage Battery storage |
508 MW | Agreement signed |
| Double Butte Storage Battery storage |
508 MW | Agreement signed |
| Galicia Storage Battery storage |
506 MW | In study |
| Ambar Energy Storage Battery storage |
505 MW | In study |
| Drifter Energy Storage Battery storage |
505 MW | Agreement signed |
| Spectrum Energy Storage Battery storage |
504 MW | Agreement signed |
| Delilah Energy Storage Battery storage |
504 MW | Agreement signed |
| Lake Elsinore Advanced Pumped Storage Project Battery storage |
500 MW | Agreement signed |
| Goldback Solar Center Battery storage |
500 MW | Agreement signed |
| Corby 2 Battery storage |
476 MW | In study |
| Shoals Energy Storage 2 Battery storage |
461 MW | In study |
| Tolenas Battery storage |
417 MW | In study |
| Dos Palmas Battery storage |
411 MW | Agreement signed |
| Shoals Energy Storage Battery storage |
409 MW | Agreement signed |
| Hidalgo Energy Storage Battery storage |
408 MW | Agreement signed |
| Simon Battery storage |
406 MW | In study |
| Gabriel Storage Battery storage |
406 MW | Agreement signed |
| Trolley Battery storage |
406 MW | Agreement signed |
| Coral Reef Battery storage |
406 MW | In study |
| Fleetwood Battery storage |
406 MW | In study |
| Marici Battery storage |
406 MW | Agreement signed |
| Tea Leaf Energy Storage Battery storage |
404 MW | In study |
| Dirac Battery storage |
403 MW | In study |
| Brushy Battery storage |
400 MW | In study |
| Golden Flats Battery storage |
365 MW | Agreement signed |
| Espresso Battery storage |
365 MW | Agreement signed |
| Northeast Central Valley Battery storage |
365 MW | In study |
| Jewelflower Storage Battery storage |
355 MW | Agreement signed |
| Allegheny Energy Storage Battery storage |
353 MW | Agreement signed |
| Moonraker Battery storage |
353 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)724 Β· 133.4 GW
- West (non-ISO utilities)352 Β· 82.2 GW
- MISO (Midcontinent)305 Β· 55.0 GW
- CAISO (California)175 Β· 48.7 GW
- SPP (Southwest Power Pool)198 Β· 31.4 GW
- PJM (Mid-Atlantic, Midwest)248 Β· 29.6 GW
- Southeast (non-ISO utilities)109 Β· 19.4 GW
- NYISO (New York)84 Β· 11.1 GW
- ISO-NE (New England)31 Β· 6,907 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)