United States › Grid › Interconnection queues › Nevada

OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in Nevada — page 8

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown35588.4 GW
Active in queue81.5 GW249 requests
Agreement signed20.9 GW82 requests
Withdrawn35588.4 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

355 requests · page 8 of 8
ProjectCapacityStatusLocationRegionQueuedOnline
Blue Sands Solar PV
Solar
5.0 MWWithdrawn / abandoned Nye, NVCAISO Apr 2015target 2015
El Dorado Solar Generating Station Project
Solar
5.0 MWWithdrawn / abandoned Clark, NVCAISO Apr 2007target 2014
Dixie Valley 2
Geothermal
5.0 MWWithdrawn / abandoned Churchill, NVCAISO Mar 2014target 2014
Solar project Company 85, Clark County
Solar
2.7 MWWithdrawn / abandoned Clark, NVWest Nov 2009target 2012
Solar project Company 154, Clark County
Solar
1.5 MWWithdrawn / abandoned Clark, NVWest Jun 2017target 2018
Page 8 of 8

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)