United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in CAISO (California) — page 7
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Rainbow Energy Center Gas |
523 MW | Withdrawn / abandoned |
| Arizona Mohave Solar Solar |
521 MW | Withdrawn / abandoned |
| Lockhart 4 Energy Storage Battery storage |
520 MW | Withdrawn / abandoned |
| Baca Solar Battery storage |
520 MW | Withdrawn / abandoned |
| Sonoran 2 Solar |
520 MW | Withdrawn / abandoned |
| Harquahala Solar Solar |
519 MW | Withdrawn / abandoned |
| Cedro Solar + storage |
519 MW | Withdrawn / abandoned |
| Carranza Solar + storage |
519 MW | Withdrawn / abandoned |
| Palmera Solar + storage |
519 MW | Withdrawn / abandoned |
| Vegas Valley Solar + storage |
519 MW | Withdrawn / abandoned |
| Midas Energy Storage Battery storage |
518 MW | Withdrawn / abandoned |
| Temescal Canyon Energy Storage Battery storage |
518 MW | Withdrawn / abandoned |
| Frates Energy Storage Battery storage |
518 MW | Withdrawn / abandoned |
| Vulcan Tertius Solar + storage |
518 MW | Withdrawn / abandoned |
| Fritts Solar + storage |
517 MW | Withdrawn / abandoned |
| Victorious Battery storage |
516 MW | Withdrawn / abandoned |
| Bellhop Battery storage |
516 MW | Withdrawn / abandoned |
| Olympic Battery storage |
515 MW | Withdrawn / abandoned |
| Stocker Storage Battery storage |
515 MW | Withdrawn / abandoned |
| Fresa Battery storage |
515 MW | Withdrawn / abandoned |
| Connor Battery storage |
515 MW | Withdrawn / abandoned |
| Appellation Battery storage |
515 MW | Withdrawn / abandoned |
| Pinecone Battery storage |
515 MW | Withdrawn / abandoned |
| Finn Wind Onshore wind |
514 MW | Withdrawn / abandoned |
| Broadcast Battery storage |
514 MW | Withdrawn / abandoned |
| Dogwood Wind Onshore wind |
514 MW | Withdrawn / abandoned |
| Chirock Battery storage |
514 MW | Withdrawn / abandoned |
| Yerba Santa Battery storage |
514 MW | Withdrawn / abandoned |
| Skydive Battery storage |
514 MW | Withdrawn / abandoned |
| Silvercoin Battery storage |
514 MW | Withdrawn / abandoned |
| Greenwood Energy Storage 2 Battery storage |
513 MW | Withdrawn / abandoned |
| Thar Energy Storage Battery storage |
513 MW | Withdrawn / abandoned |
| Moeras Energy Storage Battery storage |
513 MW | Withdrawn / abandoned |
| Rock Daisy Solar + storage |
513 MW | Withdrawn / abandoned |
| Valhalla Energy Storage Battery storage |
513 MW | Withdrawn / abandoned |
| MT Baldy Energy Storage Battery storage |
513 MW | Withdrawn / abandoned |
| Menilles Solar + storage |
511 MW | Withdrawn / abandoned |
| Kilowatt Ranch Battery storage |
511 MW | Withdrawn / abandoned |
| Blythe BESS Battery storage |
510 MW | Withdrawn / abandoned |
| Transcanada Peaker Gas |
510 MW | Withdrawn / abandoned |
| Rockfish Storage 1 Battery storage |
510 MW | Withdrawn / abandoned |
| Rockfish Storage 2 Battery storage |
510 MW | Withdrawn / abandoned |
| Grisedale Storage 1 Battery storage |
510 MW | Withdrawn / abandoned |
| Goodall Storage Battery storage |
510 MW | Withdrawn / abandoned |
| Solar Four Solar |
510 MW | Withdrawn / abandoned |
| Dolores Battery storage |
510 MW | Withdrawn / abandoned |
| Rex Solaris 2 Solar + storage |
509 MW | Withdrawn / abandoned |
| Rex Solaris 1 Solar + storage |
509 MW | Withdrawn / abandoned |
| Pinnacle Heights Solar + storage |
508 MW | Withdrawn / abandoned |
| Stockton Generation Gas |
508 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)