🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › California

GAS · CAISO

Transcanada Peaker

Transcanada Peaker is a 510 MW gas request withdrawn in the CAISO interconnection queue, in San Bernardino County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2006 (completed)
  2. Withdrawn / abandonedDec 2006 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
151
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Chino Substation 230kV Line
Location
San Bernardino County, California
Technology
Gas: 510 MW
Total requested
510 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
17 November 2006
Proposed online date
May 2011
Withdrawn
December 2006

Location

Marker shows the centre of San Bernardino County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Bernardino County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem