United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESQueue requests in study in the USA (2025 requests) β page 37
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Kickstart Energy Storage II Battery storage Β· Kickstart Infrastructure LLC |
1.4 MW | In study |
| Solar project G1075, Lane County Solar |
1.1 MW | In study |
| Solar project G1077, Lane County Solar |
0.4 MW | In study |
| Solar project T2-089, Deschutes County Solar |
0.4 MW | In study |
| Battery storage project G1085, Flathead County Battery storage |
0.3 MW | In study |
| Onshore wind project GEN-2025-GR3, Mclean County Onshore wind |
0.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- MISO (Midcontinent)389 Β· 120.6 GW
- ERCOT (Texas)339 Β· 99.6 GW
- West (non-ISO utilities)324 Β· 84.1 GW
- SPP (Southwest Power Pool)268 Β· 71.3 GW
- Southeast (non-ISO utilities)258 Β· 41.7 GW
- PJM (Mid-Atlantic, Midwest)228 Β· 29.8 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)