United States › Grid › Interconnection queues › Minnesota
OCTARY USA · INTERCONNECTION QUEUESCompleted queue projects in Minnesota — page 3
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Onshore wind project G241, Lincoln County Onshore wind |
2.0 MW | |
| Gas project G341, Cottonwood County Gas |
2.0 MW | |
| Other project G140, Nobles County Other |
2.0 MW | |
| Other project G270, Nobles County Other |
2.0 MW | |
| Other project G142, Nobles County Other |
2.0 MW | |
| Onshore wind project G398, Pipestone County Onshore wind |
2.0 MW | |
| Onshore wind project G385, Nobles County Onshore wind |
2.0 MW | |
| Onshore wind project G073, Lincoln County Onshore wind |
1.0 MW | |
| Onshore wind project G340, Lincoln County Onshore wind |
1.0 MW | |
| Solar project J554, Dodge County Solar |
1.0 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- MISO (Midcontinent)106 · 9,615 MW
- SPP (Southwest Power Pool)1 · 44.6 MW
- West (non-ISO utilities)3 · 31.0 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)