United States › Grid › Interconnection queues › Louisiana
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in Louisiana — page 3
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project J4049, Ouachita Parish County Solar |
75.0 MW | In study |
| Solar + storage project GEN-2024-220, Caddo Parish County Solar + storage |
55.0 MW | In study |
| Solar project J2292, Calcasieu Parish County Solar |
50.0 MW | In study |
| Replacing 49 MW of gas generation with BESS; Sterlington Other |
49.0 MW | In study |
| Battery storage project J2457, Orleans Parish County Battery storage |
40.0 MW | In study |
| Battery storage project J2404, East Baton Rouge Parish County Battery storage |
38.8 MW | In study |
| Solar + storage project GEN-2024-044, Caddo Parish County Solar + storage |
36.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)