United States › Grid › Interconnection queues › Kentucky
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in Kentucky, PJM — page 2
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project AG2-081, Montgomery County Solar · SR Fayette II, LLC |
30.0 MW | In study |
| Solar project AH2-263, Marion County Solar |
25.8 MW | In study |
| Solar project AH1-570 Solar · South Fork Solar, LLC |
25.0 MW | In study |
| Solar project AI2-374, Bath County Solar |
20.6 MW | In study |
| Solar project AH1-571 Solar · South Fork Solar, LLC |
20.0 MW | In study |
| Solar + storage project AH2-410 Solar + storage |
20.0 MW | In study |
| Solar project AI2-342, Pike County Solar |
15.4 MW | In study |
| Solar project AI2-404, Hart County Solar |
12.0 MW | In study |
| Solar project AI2-349, Marion County Solar |
11.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- Southeast (non-ISO utilities)51 · 10.7 GW
- PJM (Mid-Atlantic, Midwest)59 · 7,064 MW
- MISO (Midcontinent)24 · 3,706 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)