United States › Grid › Interconnection queues › Texas
OCTARY USA · INTERCONNECTION QUEUESProjects with signed interconnection agreements in Texas — page 13
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| CPS Rio Nogales CT201 Rotor Replacement Gas · CPS Energy |
3.1 MW | Agreement signed |
| Sweetwater 1 repower Onshore wind · Leeward Energy |
3.0 MW | Agreement signed |
| Champion Wind Repower Onshore wind · Champion Wind Farm, LLC |
0.3 MW | Agreement signed |
| Silver Star repower Onshore wind · Silver Star I Power Partners, LLC |
-7.2 MW | Agreement signed |
| Sherbino II Wind repower Onshore wind · Sherbino II Wind Farm LLC |
-18.0 MW | Agreement signed |
| Trinity Hills Wind repower Onshore wind · Trinity Hills Wind Farm LLC |
-27.0 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)578 · 119.3 GW
- SPP (Southwest Power Pool)18 · 4,003 MW
- West (non-ISO utilities)7 · 950 MW
- MISO (Midcontinent)3 · 332 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)