Projects with signed interconnection agreements in Texas — page 13

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown606124.6 GW
Active in queue476.4 GW2,094 requests
Agreement signed124.6 GW606 requests
Withdrawn917184.2 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

606 requests · page 13 of 13
ProjectCapacityStatusLocationRegionQueuedOnline
CPS Rio Nogales CT201 Rotor Replacement
Gas · CPS Energy
3.1 MWAgreement signed Guadalupe, TXERCOT target 2025
Sweetwater 1 repower
Onshore wind · Leeward Energy
3.0 MWAgreement signed Nolan, TXERCOT Feb 2018target 2024
Champion Wind Repower
Onshore wind · Champion Wind Farm, LLC
0.3 MWAgreement signed Nolan, TXERCOT Sep 2023target 2025
Silver Star repower
Onshore wind · Silver Star I Power Partners, LLC
-7.2 MWAgreement signed Eastland, TXERCOT Apr 2017target 2025
Sherbino II Wind repower
Onshore wind · Sherbino II Wind Farm LLC
-18.0 MWAgreement signed Pecos, TXERCOT Aug 2017target 2025
Trinity Hills Wind repower
Onshore wind · Trinity Hills Wind Farm LLC
-27.0 MWAgreement signed Young, TXERCOT Jul 2017target 2026
Page 13 of 13

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)