WIND Β· OPERATIONAL

Novar

Novar is a 17 MW onshore wind farm in Scotland, operated by Venitent Energy Services. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland
Project stageOperating
  1. PlanningMay 2003 (completed)
  2. ConsentedJun 2005 (completed)
  3. ConstructionAug 2010 (completed)
  4. OperatingSep 2012 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
17 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Venitent Energy Services
Region
Scotland
Country
Scotland
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
IV17 0XJ
Coordinates
57.7055, -4.4267

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Novar compares

249th of 488largest wind farms in the UK register
144th of 199in Scotland
0.06%of listed UK wind farms capacity
β‰ˆ 39 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 17 MW station would generate roughly 39 GWh of electricity in a year, similar to the annual use of about 14,340 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by Venitent Energy Services

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Novar Wind Farm (Extension)
Developer / operator
RWE npower
Planning authority
Highland
Planning reference
03/00426/FULRC
Application submitted
14 May 2003
Permission granted
20 June 2005
Construction started
1 August 2010
Began operating
17 September 2012
Capacity in planning record
36.8 MW
Address
Novar Estate Evanton Ross-shire, Highland
REPD reference
4013

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.