πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
WIND Β· OPERATIONAL

Burnfoot East

Burnfoot East is a 10.8 MW onshore wind farm in Scotland, operated by EDF Energy. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland
Project stageOperating
  1. PlanningJan 2017 (completed)
  2. ConsentedMar 2019 (completed)
  3. ConstructionSep 2019 (completed)
  4. OperatingJul 2020 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
10.8 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
EDF Energy
Region
Scotland
Country
Scotland
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
FK14 7JZ
Coordinates
56.2232, -3.7001

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Burnfoot East compares

318th of 488largest wind farms in the UK register
168th of 199in Scotland
0.04%of listed UK wind farms capacity
β‰ˆ 25 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 10.8 MW station would generate roughly 25 GWh of electricity in a year, similar to the annual use of about 9,110 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by EDF Energy

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Burnfoot East Wind Farm (further extension)
Developer / operator
Wind Prospect Developments
Planning authority
Clackmannanshire
Planning reference
17/00026/FULL
Application submitted
30 January 2017
Permission granted
27 March 2019
Construction started
1 September 2019
Began operating
1 July 2020
Capacity in planning record
10.8 MW
Address
Site West Of Burnfoot Hill, High Street, Tillicoultry, Central, Clackmannanshire, FK13 6A
REPD reference
6324

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.