SOLAR Β· OPERATIONAL

Winnards

Winnards is a 4.45 MW solar farm in South West England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • South West
  • England

Key facts

Installed capacity
4.45 MW
Status
Operational
Technology
Solar Β· PV
Operator
Greencoat Capital
Region
South West
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
TR9 6DG
Coordinates
50.4624, -4.9199

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Winnards compares

502nd of 662largest solar farms in the UK register
123rd of 192in South West
0.08%of listed UK solar farms capacity
β‰ˆ 3.9 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.45 MW station would generate roughly 3.9 GWh of electricity in a year, similar to the annual use of about 1,440 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South West All run by Greencoat Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Winnards Perch Solar Farm
Developer / operator
Solar Securities Group
Planning authority
Cornwall
Planning reference
PA12/05258
Application submitted
13 June 2012
Permission granted
26 October 2012
Construction started
15 June 2013
Began operating
31 July 2013
Capacity in planning record
3.8 MW
Address
Southmoor Farm, Winnards Perch, St Columb, Cornwall, Cornwall, TR9 6DG
REPD reference
2348

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.