ScottowMoor

ScottowMoor is a 33.7 MW solar farm in East of England, England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East of England
  • England
Project stageOperating
  1. PlanningOct 2014 (completed)
  2. ConsentedDec 2014 (completed)
  3. ConstructionJan 2015 (completed)
  4. OperatingMar 2015 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
33.7 MW
Status
Operational
Technology
Solar Β· PV
Operator
Greencoat Capital
Region
East of England
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
NR10 5FB
Coordinates
52.7640, 1.3556

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How ScottowMoor compares

22nd of 662largest solar farms in the UK register
6th of 76in East of England
0.60%of listed UK solar farms capacity
β‰ˆ 30 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 33.7 MW station would generate roughly 30 GWh of electricity in a year, similar to the annual use of about 10,930 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East of England All run by Greencoat Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Scottow Moor - RAF Coltishall Solar Farm (Phase 1)
Developer / operator
Greencoat Capital
Planning authority
North Norfolk
Planning reference
PF/14/1334
Application submitted
9 October 2014
Permission granted
23 December 2014
Construction started
15 January 2015
Began operating
31 March 2015
Capacity in planning record
32 MW
Address
Former RAF Coltishall, Coltishall Airfield, Filby Road, Norwich, Norfolk, Norfolk
REPD reference
1537

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.