SOLAR Β· OPERATIONAL

Parley

Parley is a 24.2 MW solar farm in South West England, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • South West
  • England

Key facts

Installed capacity
24.2 MW
Status
Operational
Technology
Solar Β· PV
Operator
RES Group
Region
South West
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
BH23 6BG
Coordinates
50.7918, -1.8612

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Parley compares

39th of 662largest solar farms in the UK register
6th of 192in South West
0.43%of listed UK solar farms capacity
β‰ˆ 21 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 24.2 MW station would generate roughly 21 GWh of electricity in a year, similar to the annual use of about 7,850 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South West All run by RES Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Planning Permission Refused
Site name in planning record
Parley Renewable Energy Park (PV)
Developer / operator
Eco Sustainable Solutions
Planning authority
Bournemouth, Christchurch and Poole
Planning reference
8/10/0604
Application submitted
23 December 2010
Capacity in planning record
5 MW
Address
Chapel Lane, Parley, Christchurch, Dorset, Dorset, BH23 6BG
REPD reference
1083

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.