Parley
Parley is a 24.2 MW solar farm in South West England, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South West
- England
Key facts
- Installed capacity
- 24.2 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- RES Group
- Region
- South West
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- BH23 6BG
- Coordinates
- 50.7918, -1.8612
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Parley compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 24.2 MW station would generate roughly 21 GWh of electricity in a year, similar to the annual use of about 7,850 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South West All run by RES GroupNearby generating sites
- Palmersford Β· 3.04 MW solar farm0.1 km
- Woodtown Β· 2.72 MW solar farm1.5 km
- Hale Β· 3.6 MW solar farm1.9 km
- Bedborough Β· 5 MW solar farm5.6 km
- Christchurch Β· 17.9 MW solar farm8.8 km
- Wedgehill Β· 13.5 MW solar farm10.2 km
- Henbury Quarry Β· 3.68 MW solar farm13.3 km
- Oaklands Β· 5 MW solar farm22.1 km
Also operated by RES Group
RES Group operates 98 sites in the register. Largest first:
- Beinneun Wind Farm Β· onshore wind farm109 MW
- Cumberhead Wind Farm Β· onshore wind farm50 MW
- Hill of Towie Wind Farm (GB) Β· onshore wind farm48.3 MW
- Crossdykes Wind Farm Β· onshore wind farm48 MW
- Blary Hill Β· onshore wind farm35 MW
- Tormywheel Β· onshore wind farm30.8 MW
- Garreg Llwyd (GB) Β· onshore wind farm30.4 MW
- Solwaybank Β· onshore wind farm30.4 MW
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Planning Permission Refused
- Site name in planning record
- Parley Renewable Energy Park (PV)
- Developer / operator
- Eco Sustainable Solutions
- Planning authority
- Bournemouth, Christchurch and Poole
- Planning reference
- 8/10/0604
- Application submitted
- 23 December 2010
- Capacity in planning record
- 5 MW
- Address
- Chapel Lane, Parley, Christchurch, Dorset, Dorset, BH23 6BG
- REPD reference
- 1083
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.