Margate
Margate is a 3.37 MW solar farm in South West England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South West
- England
Key facts
- Installed capacity
- 3.37 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Greencoat Capital
- Region
- South West
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- PL31 1HE
- Coordinates
- 50.4671, -4.6976
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Margate compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 3.37 MW station would generate roughly 3.0 GWh of electricity in a year, similar to the annual use of about 1,090 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South West All run by Greencoat CapitalNearby generating sites
- Bodmin Β· 4.98 MW solar farm3.1 km
- Rew Farm Β· 5.06 MW solar farm5.4 km
- Clann Farm Β· 1.49 MW solar farm6.5 km
- Bodwen Β· 5 MW solar farm8.4 km
- Kelly Green Β· 4.98 MW solar farm9.2 km
- Benbole Β· 1.74 MW solar farm10.1 km
- St Breock Β· 10 MW onshore wind farm10.2 km
- Langunnett Β· 6.17 MW solar farm11.1 km
Also operated by Greencoat Capital
Greencoat Capital operates 195 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Margate Solar Farm
- Developer / operator
- Lanhydrock Estate Company
- Planning authority
- Cornwall
- Planning reference
- PA14/08958
- Application submitted
- 9 October 2014
- Permission granted
- 22 December 2014
- Construction started
- 17 March 2015
- Began operating
- 1 September 2015
- Capacity in planning record
- 3 MW
- Address
- Higher Margate, Bodmin, Cornwall, Cornwall, PL31 1HE
- REPD reference
- 4878
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.