Grid infrastructure β€Ί Connection queue β€Ί Battery storage

BATTERY STORAGE Β· NGET

Royle Farm BESS

Royle Farm BESS is a 90 MW battery storage project consented, connecting to the National Grid (England & Wales) network at Drakelow 132kV Substation, with capacity due from October 2028. The connection agreement is held by Aludra BESS Ltd.

Project stageConsented
  1. Planning (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2028 (not yet reached)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-005050
Customer
Aludra BESS Ltd
Technology
Energy Storage System
Total capacity
90 MW
Change in this agreement
+90 MW
Capacity effective from
31 October 2028
Connection site
Drakelow 132kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Consents Approved
Connections reform gate
Gate 2

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Drakelow Β· Grid map

Other projects at Drakelow 132kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem