Grid infrastructure βΊ Connection queue βΊ Solar + storage
SOLAR + STORAGE Β· NGETOaklands Farm Solar PV
Oaklands Farm Solar PV is a 162 MW solar + storage project consented, connecting to the National Grid (England & Wales) network at Drakelow 132kV Substation, with capacity due from June 2027. The connection agreement is held by Oaklands Farm Solar Limited..
Project stageConsented
- Planning (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingFrom Jun 2027 (not yet reached)
- Closed (not yet reached)
Connection details
- NESO project number
- PRO-001004
- Customer
- Oaklands Farm Solar Limited.
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar)
- Total capacity
- 162 MW
- Change in this agreement
- +162 MW
- Capacity effective from
- 30 June 2027
- Connection site
- Drakelow 132kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Consents Approved
- Connections reform gate
- Gate 2
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Drakelow 132kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem