🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · NGET

Tyler Hill Bicker Fen

Tyler Hill Bicker Fen is a 400 MW battery storage project in planning, connecting to the National Grid (England & Wales) network at Coddington 400kV Substation, with capacity due from May 2035. The connection agreement is held by FRV Powertek Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom May 2035 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-004443
Customer
FRV Powertek Limited
Technology
Energy Storage System
Total capacity
400 MW
Change in this agreement
+400 MW
Capacity effective from
30 May 2035
Connection site
Coddington 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The connection site could not be placed on the map.

Projects connecting near Coddington · Grid map

Other projects at Coddington 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem