Grid infrastructure β€Ί Connection queue β€Ί Solar

SOLAR Β· NGET

Beechgreen Energyfarm

Beechgreen Energyfarm is a 50 MW solar project built and connected, connecting to the National Grid (England & Wales) network at Burwell Main 400kV Substation. The connection agreement is held by Beechgreen Energyfarm Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-001018
Customer
Beechgreen Energyfarm Limited
Technology
PV Array (Photo Voltaic/solar)
Total capacity
50 MW
Already connected
50 MW
Connection site
Burwell Main 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Burwell Main Β· Grid map

Other projects at Burwell Main 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem