NESO TEC REGISTER Β· GREAT BRITAINOffshore wind projects in the connection queue on the SP Transmission (south Scotland) network
Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.
Map
Voltage400 kV275 kV132 kVHVDCNew HVAC
ProjectsPlanningConsentedConstructionBuiltMajor project with its own page
Projects
| Project | Capacity | Stage |
|---|---|---|
| Machair Offshore Wind Farm Offshore wind Β· Scottish Power Renewables (UK) Limited |
2.0 GW | Scoping |
| Phoenix 1B Offshore Wind Farm Offshore wind Β· Morven Offshore Wind Limited |
1.5 GW | Scoping |
| Intog 2 Offshore wind Β· Cerulean Winds Limited |
1.4 GW | Scoping |
| Berwick Bank Offshore Wind Farm A Offshore wind Β· Berwick Bank A Limited |
1.4 GW | Scoping |
| Berwick Bank Offshore Wind Farm B Offshore wind Β· Berwick Bank B Limited |
1.4 GW | Scoping |
| Berwick Bank Offshore Wind Farm A Offshore wind Β· Berwick Bank A Limited |
1.2 GW | Scoping |
| Berwick Bank Offshore Wind Farm B Offshore wind Β· Berwick Bank B Limited |
1.2 GW | Scoping |
| Inch Cape Offshore Wind Farm Platform 1 Offshore wind Β· Inch Cape Offshore Limited |
540 MW | Under Construction/Commissioning |
| Inch Cape Offshore Wind Farm Platform 2 Offshore wind Β· Inch Cape Offshore Limited |
540 MW | Under Construction/Commissioning |
| Seagreen Phase 1A Offshore wind Β· Seagreen 1A Limited |
500 MW | Under Construction/Commissioning |
| Neart Na Gaoithe Offshore Wind Farm Offshore wind Β· Neart Na Gaoithe Offshore Wind Limited |
448 MW |
Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed βconnection nodesβ are listed but not mapped.