πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

Home β€Ί Grid infrastructure β€Ί Connection queue

NESO TEC REGISTER Β· GREAT BRITAIN

Solar projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown2100 MW in total
In planning41scoping or awaiting consent
Consented or building3closest to connecting
Built2connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

2 projects
ProjectCapacityStageConnection siteFrom
Beechgreen Energyfarm
Solar Β· Beechgreen Energyfarm Limited
50 MWBuilt Burwell Main 400kV Substation
National Grid (England & Wales)
Sundon Pivoted Power
Solar Β· Pivoted Power LLP
50 MWBuilt Sundon 400kV Substation
National Grid (England & Wales)

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed β€œconnection nodes” are listed but not mapped.