Home βΊ Grid infrastructure βΊ Connection queue
NESO TEC REGISTER Β· GREAT BRITAINOffshore wind projects in the connection queue
Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.
Map
Voltage400 kV275 kV132 kVHVDCNew HVAC
ProjectsPlanningConsentedConstructionBuiltMajor project with its own page
Projects
| Project | Capacity | Stage |
|---|---|---|
| Hornsea Power Station 3 Offshore wind Β· Hornsea Project Three (UK) Limited |
3.0 GW | Consents Approved |
| Hornsea Power Station 3 Offshore wind Β· Hornsea Project Three (UK) Limited |
2.3 GW | Consents Approved |
| East Anglia Three Offshore wind Β· East Anglia Three Limited |
1.3 GW | Consents Approved |
| Vanguard Offshore wind Β· Norfolk Vanguard West Limited |
1.3 GW | Consents Approved |
| Vanguard East Offshore wind Β· Norfolk Vanguard East Ltd |
1.3 GW | Consents Approved |
| Dogger Bank Project C Offshore wind Β· Doggerbank Offshore Wind Farm Project 3 Projco Limited |
1.2 GW | Consents Approved |
| Vanguard Offshore wind Β· Norfolk Vanguard West Limited |
400 MW | Consents Approved |
| Vanguard East Offshore wind Β· Norfolk Vanguard East Ltd |
400 MW | Consents Approved |
| Pentland Floating Offshore Wind Farm Offshore wind Β· Highland Wind Limited |
100 MW | Consents Approved |
Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed βconnection nodesβ are listed but not mapped.