OFFSHORE WIND Β· NGETDogger Bank Project C
Dogger Bank Project C is a 1.2 GW offshore wind project consented, connecting to the National Grid (England & Wales) network at Lackenby 400kV Substation, with capacity due from April 2025. The connection agreement is held by Doggerbank Offshore Wind Farm Project 3 Projco Limited.
Project stageConsented
- Planning (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingFrom Apr 2025 (not yet reached)
- Closed (not yet reached)
Connection details
- NESO project number
- PRO-000409
- Customer
- Doggerbank Offshore Wind Farm Project 3 Projco Limited
- Technology
- Wind Offshore
- Total capacity
- 1.2 GW
- Change in this agreement
- +1.2 GW
- Capacity effective from
- 1 April 2025
- Connection site
- Lackenby 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Consents Approved
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Lackenby 400kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem