NESO TEC REGISTER Β· GREAT BRITAIN

Gas projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown43.0 GW in total
In planning14scoping or awaiting consent
Consented or building7closest to connecting
Built83connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

4 projects
ProjectCapacityStageConnection siteFrom
Net Zero Teesside Power Project
Gas Β· Net Zero Teesside Power Limited
860 MWConsents Approved Tod Point 275kV Substation
National Grid (England & Wales)
Jul 2027
Wilton CCGT Project 1
Gas Β· Sembcorp Utilities (UK) Limited
850 MWConsents Approved Greystones B 275kV Substation
National Grid (England & Wales)
Oct 2035
Wilton CCGT Project 2
Gas Β· Sembcorp Utilities (UK) Limited
700 MWConsents Approved Greystones A 275kV Substation
National Grid (England & Wales)
Oct 2035
North Killingholme Power Project
Gas Β· Uniper UK Limited
540 MWConsents Approved Killingholme 400kV Substation
National Grid (England & Wales)
Sep 2030

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed β€œconnection nodes” are listed but not mapped.