Grid infrastructure β€Ί Connection queue β€Ί Gas

GAS Β· NGET

Net Zero Teesside Power Project

Net Zero Teesside Power Project is a 860 MW gas project consented, connecting to the National Grid (England & Wales) network at Tod Point 275kV Substation, with capacity due from July 2027. The connection agreement is held by Net Zero Teesside Power Limited.

Project stageConsented
  1. Planning (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingFrom Jul 2027 (not yet reached)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-001400
Customer
Net Zero Teesside Power Limited
Technology
CCGT (Combined Cycle Gas Turbine), Demand
Total capacity
860 MW
Change in this agreement
+860 MW
Capacity effective from
30 July 2027
Connection site
Tod Point 275kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Consents Approved

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Tod Point Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem