🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Home › Grid infrastructure › Connection queue

NESO TEC REGISTER · GREAT BRITAIN

Grid connection projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown1,590616.3 GW in total
In planning1,590scoping or awaiting consent
Consented or building265closest to connecting
Built400connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

1,590 projects · page 16 of 32
ProjectCapacityStageConnection siteFrom
Butt Lane - Grimsby BESS
Battery storage · Bluestone Butt Lane 1 Ltd
240 MWScoping SOUTH HUMBER CONNECTION NODE A 132kV
National Grid (England & Wales)
Oct 2035
Catsfield
Battery storage · MAS 001 Limited
240 MWScoping Ninfield GSP
National Grid (England & Wales)
Nov 2037
Chessington Estate
Battery storage · Chessington BESS Ltd
240 MWScoping Chessington 132kV
National Grid (England & Wales)
Nov 2037
Cilfynydd 2
Battery storage · Rewe 8 Limited
240 MWScoping Cilfynydd 400kV Substation
National Grid (England & Wales)
Oct 2037
Coddington
Battery storage · Starlight Energy UK Limited
240 MWScoping Trent Valley South Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2034
Crawcroft Lane Solar and Storage
Solar + storage · Bsr Applications Limited
240 MWScoping South Humber Connection Node A 400kV
National Grid (England & Wales)
Oct 2039
CRT Keadby 2
Battery storage · Bluestone Energy Ltd
240 MWScoping Trent Valley North Connection Node B 132kV Substation
National Grid (England & Wales)
Oct 2039
Drakelow Power Station 1 BESS
Battery storage · Bluestone Energy Ltd
240 MWScoping Derbyshire Connection Node E 132Kv Substation
National Grid (England & Wales)
Oct 2034
Drakelow Power Station 2 BESS
Battery storage · Bluestone Energy Ltd
240 MWScoping Derbyshire Connection Node E 132 kV Substation
National Grid (England & Wales)
Oct 2037
Drakelow Power Station 3 BESS
Battery storage · Bluestone Energy Ltd
240 MWScoping ERBYSHIRE CONNECTION NODE E 132kV SUBSTATION
National Grid (England & Wales)
Oct 2037
Drakelow Power Station 4
Battery storage · Bluestone Energy Ltd
240 MWScoping Derbyshire Connection Node E 132 kV Substation
National Grid (England & Wales)
Oct 2037
Fairmead and Yewtree Farm
Battery storage · Qair Renewables UK Limited
240 MWScoping East Kent connection node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Forepower Lincoln (250) Ltd
Battery storage · Forefuture Energy Ltd
240 MWScoping Navenby 132kV Substation
National Grid (England & Wales)
Oct 2034
Glen Ullinish Extension
Onshore wind · Glen Ullinish Wf 2 Ltd
240 MWAwaiting Consents Glen Ullinish Extension 132/33kV Substation
SSEN Transmission (north Scotland)
Nov 2031
Grindon Grange
Solar + storage · Starlight Energy UK Limited
240 MWScoping Norton East 400kV Substation
National Grid (England & Wales)
Oct 2035
Grovers Farm BESS
Battery storage · Bluestone Energy Ltd
240 MWScoping West London Connection Node B 132kV substation
National Grid (England & Wales)
Oct 2037
Henley Downs Farm BESS
Battery storage · Ninfield BESS Ltd
240 MWScoping East Kent connection node A 400kV Substation
National Grid (England & Wales)
Oct 2037
High Bardrain Wood & Moor
Battery storage · Bluestone Energy Ltd
240 MWScoping High Bardrain Wood & Moor 132Kv Substation
SP Transmission (south Scotland)
Oct 2033
Hill Farm
Battery storage · Qair Renewables UK Limited
240 MWScoping Capenhurst GSP
National Grid (England & Wales)
Oct 2037
Hipsey BESS
Battery storage · Kona Asset 2 Limited
240 MWScoping Dunstable 400kV Substation
National Grid (England & Wales)
Oct 2032
Housham PV & BESS
Solar + storage · Fosse Green Energy Limited
240 MWScoping Navenby 400kV Substation
National Grid (England & Wales)
May 2033
Huntington Solar PV
Solar · Edf Energy Renewables Limited
240 MWScoping West Anglia Connection Node D 400kV Substation
National Grid (England & Wales)
Oct 2037
Intwood Farm BESS
Battery storage · Intwood BESS Ltd
240 MWScoping North Anglia Connection Node A 132kV Substation
National Grid (England & Wales)
Oct 2034
Kinder PV & BESS Station
Solar + storage · Ibv Danethorpe Lane Solar Limited
240 MWScoping Trent Valley South Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2039
Lackenby PV & BESS Station
Solar + storage · Ib Vogt UK Ltd
240 MWScoping Teeside Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2033
Lambeeth 240MW
Battery storage · Ecodev Group Ltd
240 MWScoping Pembroke 400kV Substation
National Grid (England & Wales)
Dec 2037
Lightsource Bagots Farm
Wind + storage · Lightsource Renewable UK Development Limited
240 MWScoping Derbyshire Connection Node E 400kV Substation
National Grid (England & Wales)
Oct 2037
Lightsource Berthlwyd
Solar + storage · Lightsource Renewable UK Development Limited
240 MWScoping Mid Wales Connection Node A 400Kv Substation
National Grid (England & Wales)
Oct 2037
Lightsource Bramford PV & BESS
Solar + storage · Lightsource Renewable UK Development Limited
240 MWScoping South Anglia Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2034
Lightsource Braybrooke
Solar + storage · Lightsource Renewable UK Development Limited
240 MWScoping West Anglia Connection Node F 400kV Substation
National Grid (England & Wales)
Oct 2034
Lightsource Enderby PV+BESS
Solar + storage · Lightsource Renewable UK Development Limited
240 MWScoping Derbyshire Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2037
Lightsource Ferryside PV
Solar + storage · Lightsource Renewable UK Development Limited
240 MWScoping South Wales West Connection Node C 400kV
National Grid (England & Wales)
Oct 2038
Lightsource Folly Farm
Wind + storage · Lightsource Renewable UK Development Limited
240 MWScoping Severn Connection Node A 400kv Substation
National Grid (England & Wales)
Oct 2037
Lightsource Grendon PV+BESS
Solar + storage · Lightsource Renewable UK Development Limited
240 MWScoping West Anglia Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2034
Lightsource Hawthorne Pit
Solar + storage · Lightsource Renewable UK Development Limited
240 MWScoping Wearside Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2035
Lightsource Jubilee Farm
Solar + storage · Lightsource Renewable UK Development Limited
240 MWScoping Jubilee Farm 275kV Substation
National Grid (England & Wales)
Oct 2034
Lightsource Lower Frankton
Solar + storage · Lightsource Renewable UK Development Limited
240 MWScoping Cheshire Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Lightsource Marston Vale 240MW PV+BESS
Solar + storage · Lightsource Renewable UK Development Limited
240 MWScoping Marston Vale 400kV Substation
National Grid (England & Wales)
Oct 2034
Lightsource Middleton
Solar + storage · Lightsource Renewable UK Development Limited
240 MWScoping Middleton 400KV Substation
National Grid (England & Wales)
Oct 2037
Lightsource New Eggborough
Wind + storage · Lightsource Renewable UK Development Limited
240 MWScoping Leeds North Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2035
Lightsource Newchurch PV/BESS
Solar + storage · Lightsource Renewable UK Development Limited
240 MWScoping East Kent connection node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Lightsource Norton East PV
Solar + storage · Lightsource Renewable UK Development Limited
240 MWScoping Norton East 400kV Substation
National Grid (England & Wales)
Oct 2035
Lightsource Offerton
Solar + storage · Lightsource Renewable UK Development Limited
240 MWScoping Wearside Connection Node B 2 400kV Substation
National Grid (England & Wales)
Oct 2035
Lightsource Overton
Solar + storage · Lightsource Renewable UK Development Limited
240 MWScoping North Humber Connection Node E 400kV Substation
National Grid (England & Wales)
Oct 2035
Lightsource Patford Bridge
Solar + storage · Lightsource Renewable UK Development Limited
240 MWScoping Derbyshire Connection Node I 400kV Substation
National Grid (England & Wales)
Oct 2037
Lightsource Shipley PV
Solar + storage · Lightsource Renewable UK Development Limited
240 MWScoping Sussex and Romney Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2037
Lightsource Willington
Wind + storage · Lightsource Renewable UK Development Limited
240 MWScoping Derbyshire Connection Node D 400kV Substation
National Grid (England & Wales)
Oct 2037
Lightsource Yaxley PV
Solar + storage · Lightsource Renewable UK Development Limited
240 MWScoping North Anglia Connection Node E 400kV Substation
National Grid (England & Wales)
Oct 2034
Lightsourcebp Wakeleys Wind and BESS
Wind + storage · Lightsource Renewable UK Development Limited
240 MWScoping Derbyshire Connection Node G 400kV
National Grid (England & Wales)
Oct 2037
Middle Farm Chollerton
Solar + storage · Enray Power Ltd
240 MWScoping Borders Connection Node A 400kV
National Grid (England & Wales)
Oct 2035
Page 16 of 32

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.