🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Home › Grid infrastructure › Connection queue

NESO TEC REGISTER · GREAT BRITAIN

Battery storage projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown609178.0 GW in total
In planning609scoping or awaiting consent
Consented or building126closest to connecting
Built79connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

609 projects · page 13 of 13
ProjectCapacityStageConnection siteFrom
Talladh a Bheithe
Battery storage · Muirden Energy LLP
20 MWScoping Rannoch GSP
SSEN Transmission (north Scotland)
Oct 2035
Kincorth BESS
Battery storage · Kincorth Energy Storage System Ltd
20 MWScoping Redmoss GSP
SSEN Transmission (north Scotland)
Oct 2031
Feckenham Greener Grid Park
Battery storage · Statkraft UK Ltd
12 MWScoping Feckenham 400kV Substation
National Grid (England & Wales)
Oct 2028
Dersalloch Wind Farm Extension
Battery storage · Scottish Power Renewables (UK) Limited
11 MWScoping Dersalloch 132/33kV
SP Transmission (south Scotland)
Oct 2027
Scatsta1 Greener Grid Park
Battery storage · Statkraft Hydrogen UK Holding Limited
5 MWScoping Scatsta 132kV Substation
SSEN Transmission (north Scotland)
Oct 2028
GF Upper Boat
Battery storage · Pulse Clean Energy Spv Franklin Limited
0 MWScoping Upper Boat 275kV Substation
National Grid (England & Wales)
May 2025
GF Upper Boat
Battery storage · Pulse Clean Energy Spv Franklin Limited
0 MWScoping Upper Boat 275kV Substation
National Grid (England & Wales)
Oct 2025
Ninfield Greener Grid Park
Battery storage · Ninfield Grid Solutions Limited
0 MWAwaiting Consents Ninfield 400kV Substation
National Grid (England & Wales)
Apr 2027
Spennymoor Greener Grid Park
Battery storage · Spennymoor Grid Solutions Limited
0 MWAwaiting Consents Spennymoor 400kV Substation
National Grid (England & Wales)
Oct 2027
Page 13 of 13

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.