🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content Skip to project content
GENERATION · NETWORKS · ELECTRICITY DEMAND

All energy projects

Explore operating assets, construction and proposals across the electricity system. Find the capacity, planning status and evidence behind each project.

1,583Matching project records
0Operating records
0Construction or enabling works
July 2026Official renewable register edition
DESNZ tracks projects over 150 kW, with limitations for smaller historical projects. Rows represent planning records and may include linked applications, extensions and separate storage phases. Do not sum them as a definitive national fleet total.
Reset filters

Project map

Use the map to explore the matching projects. Solid markers show published or mapped points; shaded dashed circles show approximate areas. Cable endpoints are shown separately.

Loading OpenStreetMap…

1,583 results

Understand capacity and annual energy →
Data centres

Wester Hermiston Data Centre Campus

In planning
200 MW

Proposed campus capacity

Edinburgh · Scotland

Apatura

Apatura’s consultation describes a 200 MW campus on land at Wester Hermiston. This is a development proposal. No current metered electricity use or operating renewable supply is reported for this project.

Data centres

Westerhill Data Centre Campus

In planning
300 MW

Proposed campus capacity

East Dunbartonshire · Scotland

Apatura

The developer proposes a 300 MW campus within the Westerhill Regeneration Area. Consultation and planning work are distinct from construction and operation. Published campus capacity is not a measurement of present electricity demand.

Transmission links

Western Link 2

In planning
Not published

Rating requires confirmation

Ayrshire / Gwynedd · United Kingdom

SP Energy Networks / National Grid

Western Link 2 is a proposed predominantly subsea connection from Ayrshire to the Gwynedd coast. A new converter would connect to Pentir substation. Public consultation took place in 2026. The project is separate from the operating Western Link.

GRID CONTEXT

Great Britain electricity now

Explore the grid →
Loading the latest published grid interval…

National figures from the Carbon Intensity API. These do not measure an individual project’s output, cable flow or data-centre electricity use.

The wider power system

Explore conventional and nuclear power stations, grid connections, renewable technology guides and source updates.

Read the scope, licences and refresh schedule