Data centres · Edinburgh

Wester Hermiston Data Centre Campus

In planning

Apatura’s consultation describes a 200 MW campus on land at Wester Hermiston. This is a development proposal. No current metered electricity use or operating renewable supply is reported for this project.

Sources reviewed 2026-10-08 · Apatura

Project facts

StatusIn planning
Developer / operatorApatura
RegionEdinburgh
CountryScotland
Published rating200 MW
Rating definitionProposed campus capacity
Connection / routeEdinburgh; connection timing not verified
Delivery targetNot verified in this profile

Electricity demand and supply

IT capacityNot published
Grid connection capacityNot published
Apparent power reservation / substation ratingNot published
Measured average electricity demandNot published
Published annual electricity consumptionNot published
Power usage effectiveness (PUE)Not published

Where its electricity comes from

Grid supply. Site-specific renewable contracts, private-wire supply and annual consumption have not been confirmed in the reviewed source.

Cooling, water and backup power

Cooling and water-use figures have not been independently confirmed.

Backup capacity and fuel are not quantified in this profile.

Rated capacity is not present consumption. Renewable procurement claims describe contracts or certificates unless hourly matching and physical supply are evidenced. No live site meter is connected to this page.

Project location

This point is published in the developer’s consultation map. It identifies the project location, not a surveyed boundary or a public entrance.

Loading OpenStreetMap…

  • Wester Hermiston Data Centre Campus — developer map point Developer-published location Open larger map Location source 55.91611, -3.33194 · WGS84

Markers identify sites, published points or labelled connection areas. Markers are not site boundaries or entrances. EGL2’s additional outlines and route layers are explicitly identified in the developer’s map data.

Sources and review date

  1. Apatura project information
    Reviewed 2026-10-08

How Octary distinguishes proposals, published ratings and live measurements

Report a correction with a source

GRID CONTEXT

Great Britain electricity now

Explore the grid →
Loading the latest published grid interval…

National figures from the Carbon Intensity API. These do not measure an individual project’s output, cable flow or data-centre electricity use.