Data centres Β· East Dunbartonshire

Westerhill Data Centre Campus

In planning

The developer proposes a 300 MW campus within the Westerhill Regeneration Area. Consultation and planning work are distinct from construction and operation. Published campus capacity is not a measurement of present electricity demand.

Sources reviewed 2026-10-08 Β· Apatura

Project facts

StatusIn planning
Developer / operatorApatura
RegionEast Dunbartonshire
CountryScotland
Published rating300 MW
Rating definitionProposed campus capacity
Connection / routeEast Dunbartonshire
Delivery targetNot verified in this profile

Electricity demand and supply

IT capacityNot published
Grid connection capacityNot published
Apparent power reservation / substation ratingNot published
Measured average electricity demandNot published
Published annual electricity consumptionNot published
Power usage effectiveness (PUE)Not published

Where its electricity comes from

Grid supply. Site-specific renewable contracts, private-wire supply and annual consumption have not been confirmed in the reviewed source.

Cooling, water and backup power

Cooling and water-use figures have not been independently confirmed.

Backup capacity and fuel are not quantified in this profile.

Rated capacity is not present consumption. Renewable procurement claims describe contracts or certificates unless hourly matching and physical supply are evidenced. No live site meter is connected to this page.

Project location

This point is published in the developer’s consultation map. It identifies the project location, not a surveyed boundary or a public entrance.

Loading OpenStreetMap…

Markers identify sites, published points or labelled connection areas. Markers are not site boundaries or entrances. EGL2’s additional outlines and route layers are explicitly identified in the developer’s map data.

Sources and review date

  1. Apatura project information
    Reviewed 2026-10-08

How Octary distinguishes proposals, published ratings and live measurements

Report a correction with a source