United States › Power plants › Other power plants › Texas
OTHER POWER PLANTSTexas Clean Energy Project
Texas Clean Energy Project is a 400 MW cancelled power plant in Ector County, Texas, operated by Summit Texas Clean Energy.
Plant statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| TCE1A | Other Gases | 274 MW | Cancelled or postponed |
| TCE1B | Other Gases | 126 MW | Cancelled or postponed |
Plant details
- Operator
- Summit Texas Clean Energy
- Location
- Ector County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Cancelled: 400 MW
- EIA plant ID
- 59859
Location
31.7529, -102.5938
Nearby power plants
- Judkins BESSBattery storage · 9.9 MW · 2.6 mi
- Swift Air Solar IISolar farms · 174 MW · 4.8 mi
- Swift Air Solar IIISolar farms · 100 MW · 4.8 mi
- Rockhound ASolar farms · 245 MW · 4.8 mi
- Rockhound CSolar farms · 61.0 MW · 4.8 mi
- Swift Air Solar ISolar farms · 145 MW · 6.1 mi
- Rockhound DSolar farms · 28.0 MW · 6.4 mi
- Oberon IASolar farms · 150 MW · 7.2 mi
- Oberon IBSolar farms · 30.0 MW · 7.4 mi
- Non-PLD US-El Paso - BSSAT004Battery storage · 9.9 MW · 9.9 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem