United States βΊ Power plants βΊ Oregon
OCTARY USA Β· POWER PLANTSPlanned power plants in Oregon
Every power plant in the United States with a generator of 1 MW or more, from solar, wind and batteries to gas, nuclear, hydro and coal: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.
Map
Plants
| Plant | Capacity | Stage |
|---|---|---|
| Sunstone Solar Solar farms, Battery storage |
2,400 MW | In planning |
| Deschutes Solar and BESS Solar farms, Battery storage |
2,000 MW | In planning |
| Cedar Island Solar LLC Solar farms |
800 MW | In planning |
| Nolin Hills Solar farms, Wind farms |
600 MW | In planning |
| Salmonfly Solar and Storage Solar farms, Battery storage |
494 MW | In planning |
| Obsidian Solar Center Solar farms |
400 MW | In planning |
| Biglow Solar Generation and BESS Solar farms, Battery storage |
250 MW | In planning |
| Tualatin Battery Energy Storage System Battery storage |
200 MW | In planning |
| Canyonville Solar LLC (CSG) Solar farms |
2.5 MW | In planning |
Operating capacity by state
Click a state to drill down; click it again to go back to the whole country.
Capacity by technology
Solid: operating. Light: planned or under construction.
- Hydroelectric plants7,994 MW
- Solar farms1,462 MW Β· +4,540 MW pipeline
- Wind farms4,181 MW Β· +300 MW pipeline
- Gas power plants4,349 MW
- Battery storage523 MW Β· +2,940 MW pipeline
- Bioenergy plants243 MW
- Geothermal plants33.0 MW
- Oil-fired power plants9.6 MW
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Sunstone Solar, LLC1 plants Β· 2,400 MW
- DECH bn, LLC1 plants Β· 2,000 MW
- Cedar Island Solar LLC1 plants Β· 800 MW
- Nolin Hills Wind, LLC1 plants Β· 600 MW
- BrightNight Power1 plants Β· 494 MW
- Obsidian Solar Center LLC1 plants Β· 400 MW
- BIGL bn, LLC1 plants Β· 250 MW
- TUAL bn, LLC1 plants Β· 200 MW
- SolRiver Capital LLC1 plants Β· 2.5 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map