United States › Power plants › California
OCTARY USA · POWER PLANTSPower plants in California — page 35
Every power plant in the United States with a generator of 1 MW or more, from solar, wind and batteries to gas, nuclear, hydro and coal: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.
Map
Plants
| Plant | Capacity | Stage |
|---|---|---|
| Vintner Solar Solar farms |
1.5 MW | |
| Windsor Floating Solar Solar farms |
1.5 MW | |
| Wingmaster Solar farms |
1.5 MW | |
| Wonderful Huller & Shelling Solar farms |
1.5 MW | |
| Zonneveld Oak Grove Solar farms |
1.5 MW | |
| Ameresco Johnson Canyon Bioenergy plants |
1.4 MW | |
| Angels Hydroelectric plants |
1.4 MW | |
| Bakersfield 111 Solar farms |
1.4 MW | |
| Bear Valley Hydroelectric plants |
1.4 MW | |
| Beringer Solar farms |
1.4 MW | |
| Bishop Ranch - BR 3-FF Solar farms, Battery storage |
1.4 MW | Under construction |
| Bishop Ranch - BR 3-HH Solar farms, Battery storage |
1.4 MW | Under construction |
| Bishop Ranch BR 1-X Solar farms, Battery storage |
1.4 MW 1 MWh |
|
| DESI-2 Battery Storage Facility Battery storage |
1.4 MW 4 MWh |
|
| Fremont - Kato Rd Solar farms |
1.4 MW | |
| Fresno Hoover High School Hybrid Solar farms, Battery storage |
1.4 MW 0 MWh |
|
| Frontier HS Solar Project Solar farms |
1.4 MW | |
| Grossmont HS Solar Project Solar farms |
1.4 MW | |
| J&A-Santa Maria II LLC Bioenergy plants |
1.4 MW | |
| Kaiser Deer Valley Rd. Fuel Cell Gas power plants |
1.4 MW | |
| Las Virgenes MWD - Composting Plant Solar farms, Battery storage |
1.4 MW | Under construction |
| Legoland CA Phase I Solar farms |
1.4 MW | |
| Moonlight Packing - Phase 2 Solar farms |
1.4 MW | |
| North Juvenile Detention Center Solar Solar farms, Battery storage |
1.4 MW 1 MWh |
|
| Oak Flat Hydroelectric plants |
1.4 MW | |
| Riverside RWQCP Fuel Cell Bioenergy plants |
1.4 MW | |
| Sacramento (SMUD) Solar farms |
1.4 MW | |
| Sanger USD - Sanger West HS Solar farms, Battery storage |
1.4 MW | Under construction |
| Santa Rita Jail Fuel Cell Gas power plants |
1.4 MW | |
| SB Water Reclamation Fuel Cell Bioenergy plants |
1.4 MW | |
| Torrance Dis Ctr 2 - SLLAX100 Solar farms |
1.4 MW | Under construction |
| Tulare Success Power Project Hydroelectric plants |
1.4 MW | |
| Vallecitos Water District Solar farms |
1.4 MW | |
| VS BC Pacific Gateway, LLC Solar farms |
1.4 MW | |
| Vulcan San Emidio Solar Solar farms |
1.4 MW | |
| 2127 Harris Solar Project Solar farms |
1.3 MW | |
| 9150 Hermosa Solar GM Solar farms |
1.3 MW | |
| Aerolease Solar farms |
1.3 MW | |
| AT&T Anaheim Gas power plants |
1.3 MW | |
| AT&T Holger Gas power plants |
1.3 MW | |
| Bandini - SLLAX710 Solar farms |
1.3 MW | Under construction |
| Bayer Oxnard - Meter# 4719 Solar farms |
1.3 MW | |
| Building F Solar farms |
1.3 MW | |
| Calibrant Bakersfield LLC Solar farms |
1.3 MW | |
| Colon PV Solar farms |
1.3 MW | |
| County of San Diego SBRC Solar farms |
1.3 MW | |
| CSD 2 - Heritage High Solar farms |
1.3 MW | |
| CSU Northridge Plant Solar farms |
1.3 MW | |
| CSU Sacramento I Solar farms |
1.3 MW | |
| Deer Creek 2 Solar farms |
1.3 MW |
Operating capacity by state
Click a state to drill down; click it again to go back to the whole country.
Capacity by technology
Solid: operating. Light: planned or under construction.
- Gas power plants40.0 GW · +114 MW pipeline
- Solar farms25.6 GW · +7,816 MW pipeline
- Battery storage16.5 GW · +9,936 MW pipeline
- Hydroelectric plants13.6 GW · +1,608 MW pipeline
- Wind farms6,594 MW · +212 MW pipeline
- Geothermal plants2,718 MW
- Nuclear power plants2,323 MW
- Bioenergy plants904 MW · +29.0 MW pipeline
- Other power plants218 MW · +550 MW pipeline
- Oil-fired power plants522 MW
- Coal power plants55.0 MW
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Pacific Gas & Electric Co.65 plants · 7,744 MW
- Los Angeles Department of Water & Power27 plants · 5,953 MW
- IPX Power USA, LLC9 plants · 4,811 MW
- Southern California Edison Co37 plants · 2,988 MW
- Terra-Gen Operating Co-Hybrid11 plants · 2,185 MW
- Sacramento Municipal Util Dist14 plants · 2,172 MW
- U S Bureau of Reclamation11 plants · 1,966 MW
- Dynegy -Moss Landing LLC1 plants · 1,848 MW
- Ormond Beach Power, LLC1 plants · 1,612 MW
- Premium Energy Holdings2 plants · 1,600 MW
- California Dept. of Water Resources8 plants · 1,589 MW
- MN8 Energy LLC66 plants · 1,556 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map