πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Power plants β€Ί Other power plants β€Ί California

OCTARY USA Β· OTHER POWER PLANTS

Other power plants in California

Generators that use other or mixed energy sources. Click a state to drill down, or search near a place.

Operating12plants
Operating capacity218 MWnameplate
Under construction0.0 MW0 plants
Whole pipeline550 MWplanned, approved and building

Map

Loading plants…
OperatingUnder constructionApprovedPlannedRetiredCancelled

Plants

14 plants
PlantCapacityStageStateOwner / operatorYear
Willow Rock Energy Storage Center 500 MW In planning CA
Kern
GEM A-CAES LLC 2030
Phillips 66 Rodeo Refinery 54.9 MW Operating CA
Contra Costa
Phillips 66 Company 1987
CE&P Imperial Valley 1 50.0 MW Consented CA
Imperial
California Ethanol Power, LLC 2029
Torrance Refining Company, LLC 49.3 MW Operating CA
Los Angeles
Torrance Refining Company, LLC 1983
Wilmington Hydrogen Plant 31.9 MW Operating CA
Los Angeles
Air Products & Chemicals Inc 1996
Martinez Refining 20.0 MW Operating CA
Contra Costa
Martinez Refining Co 1995
Richmond Cogen 17.9 MW Operating CA
Contra Costa
Chevron Products Company-Richmond 2019
BP Carson Refinery 12.0 MW Operating CA
Los Angeles
Tesoro Carson Refinery 1984
C&H Sugar Plant 8.0 MW Operating CA
Contra Costa
C&H Sugar Company Inc 1957
Calistoga Resilency Center 8.0 MW Operating CA
Napa
Calistoga Resiliency Center, LLC 2025
Signal Hill West Unit 5.7 MW Operating CA
Los Angeles
Signal Hill Petroleum, Inc 2004
Dominguez Plant 5.0 MW Operating CA
Los Angeles
Eco Services Corp. 1976
Martinez Sulfuric Acid Regeneration Plt 4.0 MW Operating CA
Contra Costa
Eco Services Corp. 1978
Plant No 2 Orange County 1.0 MW Operating CA
Orange
Orange County Sanitation Dist - (CA) 1993

Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map