🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Solar farms › California

SOLAR FARMS

CSU Northridge Plant

CSU Northridge Plant is a 1.3 MW operating solar farm in Los Angeles County, California, operated by California State University, Northridge.

Plant statusOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingDec 2001 (current stage)
  5. ClosedAug 2018 (not yet reached)

This plant has generators at more than one stage; see the table below.

Open in Google MapsMore solar farms in California

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
G6PVSolar Photovoltaic0.7 MW OperatingJul 2025
B2PVSolar Photovoltaic0.4 MW OperatingApr 2005
E6PVSolar Photovoltaic0.2 MW OperatingMar 2003
63Other Natural Gas0.3 MW RetiredJan 2007Aug 2018
64Other Natural Gas0.3 MW RetiredJan 2007Aug 2018
65Other Natural Gas0.3 MW RetiredJan 2007Aug 2018
67Other Natural Gas0.3 MW RetiredJan 2007Aug 2018
CP1Natural Gas Fired Combustion Turbine0.2 MW RetiredDec 2001Aug 2018

Plant details

Operator
California State University, Northridge
Location
Los Angeles County, California
Balancing authority
LDWP
Sector
Commercial Non-CHP
Capacity
Operating: 1.3 MW
Retired: 1.4 MW
First unit online
Dec 2001
EIA plant ID
58422

Location

34.2433, -118.5306

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem