United States › Power plants › California
OCTARY USA · POWER PLANTSUnder-construction power plants in California — page 2
Every power plant in the United States with a generator of 1 MW or more, from solar, wind and batteries to gas, nuclear, hydro and coal: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.
Map
Plants
| Plant | Capacity | Stage |
|---|---|---|
| Merced BESS Battery storage |
3.0 MW | Under construction |
| Minneola Solar Solar farms |
3.0 MW | Under construction |
| Pittsburg RV Solar Solar farms |
2.8 MW | Under construction |
| OES Biogas Power Bioenergy plants |
2.6 MW | Under construction |
| Lerdo Middle Solar farms |
2.4 MW | Under construction |
| Pivot Energy PPA 29 LLC Solar farms, Battery storage |
2.3 MW | Under construction |
| Ranch 4701 Solar farms |
2.3 MW | Under construction |
| Bakersfield Driver Solar farms, Battery storage |
2.0 MW | Under construction |
| Imperator Solar Solar farms |
2.0 MW | Under construction |
| 20525 Nordhoff PV (North) Solar farms |
1.9 MW | Under construction |
| American Canyon RV Boat Storage Solar farms |
1.9 MW | Under construction |
| Bishop Ranch - BR 3-GG Solar farms, Battery storage |
1.9 MW | Under construction |
| NorCal FPV 1 (Pond 2) Solar farms |
1.8 MW | Under construction |
| Palmdale Water District HQ Solar farms |
1.7 MW | Under construction |
| L3 Harris San Diego Solar farms |
1.6 MW | Under construction |
| Bishop Ranch - BR 3-FF Solar farms, Battery storage |
1.4 MW | Under construction |
| Bishop Ranch - BR 3-HH Solar farms, Battery storage |
1.4 MW | Under construction |
| Las Virgenes MWD - Composting Plant Solar farms, Battery storage |
1.4 MW | Under construction |
| Sanger USD - Sanger West HS Solar farms, Battery storage |
1.4 MW | Under construction |
| Torrance Dis Ctr 2 - SLLAX100 Solar farms |
1.4 MW | Under construction |
| Bandini - SLLAX710 Solar farms |
1.3 MW | Under construction |
| Fordyce - SLLAX680 Solar farms |
1.3 MW | Under construction |
| Palmdale Water District 6MG Tank Solar farms, Battery storage |
1.3 MW | Under construction |
| South Bay Dis Ctr 6-SLLAX680 Solar farms |
1.3 MW | Under construction |
| San Pedro Public Market (SPPM) Solar farms |
1.2 MW | Under construction |
| South Bay Dis Ctr 12 - SLLAX104 Solar farms |
1.2 MW | Under construction |
| CA National City Terminal Ave Solar farms |
1.1 MW | Under construction |
| San Leandro 10 - sleba702 Solar farms |
1.0 MW | Under construction |
| Stockton 1 - slcva801 Solar farms |
1.0 MW | Under construction |
| Stockton 9 - slcva209 Solar farms |
1.0 MW | Under construction |
| VS HR Warner NEM, LLC Solar farms |
1.0 MW | Under construction |
Operating capacity by state
Click a state to drill down; click it again to go back to the whole country.
Capacity by technology
Solid: operating. Light: planned or under construction.
- Gas power plants40.0 GW · +114 MW pipeline
- Solar farms25.6 GW · +7,816 MW pipeline
- Battery storage16.5 GW · +9,936 MW pipeline
- Hydroelectric plants13.6 GW · +1,608 MW pipeline
- Wind farms6,594 MW · +212 MW pipeline
- Geothermal plants2,718 MW
- Nuclear power plants2,323 MW
- Bioenergy plants904 MW · +29.0 MW pipeline
- Other power plants218 MW · +550 MW pipeline
- Oil-fired power plants522 MW
- Coal power plants55.0 MW
Largest owners and operators
By capacity in the current view. Click to see their plants.
- 26SB 8me LLC1 plants · 1,000 MW
- Pelicans Jaw Solar LLC1 plants · 679 MW
- Terra-Gen Operating Co-Hybrid1 plants · 578 MW
- Clenera DevCo LLC1 plants · 516 MW
- SE Athos II, LLC1 plants · 402 MW
- San Gabriel Project LLC1 plants · 400 MW
- Marici Project LLC1 plants · 400 MW
- CDH Vidal LLC1 plants · 320 MW
- Sacramento Valley Energy Center, LLC1 plants · 300 MW
- Overnight Solar LLC1 plants · 300 MW
- IPX Power USA, LLC1 plants · 290 MW
- 45MG 8me LLC1 plants · 263 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map