United States › Power plants › Solar farms › California
SOLAR FARMSCA National City Terminal Ave
CA National City Terminal Ave is a 1.1 MW under construction solar farm in San Diego County, California, operated by Catalyze National City Terminal Avenue Microgrid, LLC.
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Nov 2026 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Nov 2026.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 21938 | Solar Photovoltaic | 1.1 MW | Under construction (over 50%) |
Plant details
- Operator
- Catalyze National City Terminal Avenue Microgrid, LLC
- Location
- San Diego County, California
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
- Capacity
- Under construction: 1.1 MW
- EIA plant ID
- 69533
Location
32.6540, -117.1190
Nearby power plants
- County of San Diego SBRCSolar farms · 1.3 MW · 2.8 mi
- Peregrine Energy Storage LLCBattery storage · 200 MW · 2.8 mi
- CP Kelco San Diego PlantGas power plants · 19.2 MW · 3.2 mi
- Naval Hospital Medical CenterGas power plants · 5.3 MW · 5.2 mi
- Paradise Energy StorageBattery storage · 10.0 MW · 5.3 mi
- Chula Vista Energy Center 2Battery storage · 50.0 MW · 5.4 mi
- Chula Vista Energy CenterGas power plants · 37.2 MW · 5.6 mi
- EnerSmart Chula Vista Sub StationBattery storage · 6.0 MW · 5.7 mi
- San Diego International Airport BESSBattery storage · 2.0 MW · 7.0 mi
- Lindberg Field Solar 2Solar farms · 1.9 MW · 7.2 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem