πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Power plants

OCTARY USA Β· POWER PLANTS

Key Capture Energy: power plants in the USA

Every power plant in the United States with a generator of 1 MW or more, from solar, wind and batteries to gas, nuclear, hydro and coal: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.

Operating12plants
Operating capacity600 MWnameplate
Under construction0.0 MW0 plants
Whole pipeline396 MWplanned, approved and building

Map

Loading plants…
OperatingUnder constructionApprovedPlannedRetiredCancelled

Plants

18 plants
PlantCapacityStageStateOwner / operatorYear
NY2 Battery
Battery storage
152 MW In planning NY
Orange
Key Capture Energy 2028
TX10 Hummingbird Storage
Battery storage
100 MW
227 MWh
Operating TX
Denton
Key Capture Energy 2024
TX12 Silicon Hill Storage
Battery storage
100 MW
100 MWh
Operating TX
Travis
Key Capture Energy 2022
TX15 Limousin Oak Storage
Battery storage
100 MW
227 MWh
Operating TX
Grimes
Key Capture Energy 2024
KCE NY 29, LLC
Battery storage
79.0 MW In planning NY
Suffolk
Key Capture Energy 2030
KCE NY 30, LLC
Battery storage
50.0 MW In planning NY
Suffolk
Key Capture Energy 2030
KCE NY 31, LLC
Battery storage
50.0 MW In planning NY
Suffolk
Key Capture Energy 2031
TX11 Republic Road Storage
Battery storage
50.0 MW
50 MWh
Operating TX
Robertson
Key Capture Energy 2022
TX13 Endurance Park Storage
Battery storage
50.0 MW
50 MWh
Operating TX
Scurry
Key Capture Energy 2022
TX19 River Valley Storage 1
Battery storage
50.0 MW
111 MWh
Operating TX
Williamson
Key Capture Energy 2023
TX21 River Valley Storage 2
Battery storage
50.0 MW
107 MWh
Operating TX
Williamson
Key Capture Energy 2023
TX23 Roughneck Storage
Battery storage
50.0 MW
50 MWh
Operating TX
Brazoria
Key Capture Energy 2022
KCE CT 1, LLC
Battery storage
45.0 MW In planning CT
Windham
Key Capture Energy 2031
KCE NY 10, LLC
Battery storage
20.0 MW In planning NY
Erie
Key Capture Energy 2028
NY6 Battery
Battery storage
20.0 MW
42 MWh
Operating NY
Erie
Key Capture Energy 2023
TX2 Port Lavaca
Battery storage
9.9 MW
12 MWh
Operating TX
Calhoun
Key Capture Energy 2020
TX7 Flat Top
Battery storage
9.9 MW
17 MWh
Operating TX
Reeves
Key Capture Energy 2020
TX8 Worsham
Battery storage
9.9 MW
18 MWh
Operating TX
Pecos
Key Capture Energy 2020

Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map