United States › Power plants › Battery storage › New York
BATTERY STORAGEKCE NY 30, LLC
KCE NY 30, LLC is a 50.0 MW planned battery storage site in Suffolk County, New York, operated by Key Capture Energy.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2030 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2030.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| NY30 | Batteries | 50 MW | Planned, approvals not yet sought |
Plant details
- Operator
- Key Capture Energy
- Location
- Suffolk County, New York
- Balancing authority
- NYIS
- Sector
- IPP Non-CHP
- Capacity
- Planned: 50.0 MW
- EIA plant ID
- 67838
Location
40.6948, -73.3518
Nearby power plants
- West BabylonOil-fired power plants · 52.4 MW · 0.2 mi
- SL BabylonSolar farms · 9.0 MW · 2.8 mi
- Reworld Babylon IncBioenergy plants · 17.0 MW · 3.3 mi
- Pinelawn Power LLCGas power plants · 82.0 MW · 3.5 mi
- South Oaks HospitalGas power plants · 1.0 MW · 3.9 mi
- DennisonSolar farms · 2.0 MW · 4.9 mi
- North CountySolar farms · 1.0 MW · 4.9 mi
- Edgewood Energy LLCGas power plants · 100 MW · 7.0 mi
- BrentwoodGas power plants · 47.0 MW · 7.1 mi
- Bethpage Power PlantGas power plants · 240 MW · 8.5 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem