πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Transmission lines

OCTARY USA Β· TRANSMISSION

Entergy Texas, Inc.: Transmission lines in the USA

The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.

Line sections334mapped segments
Route length1,842 km1,144 mi
345 kV and above9.9 kmthe backbone
Owners1utilities and others

Map

Loading lines…
345 kV220–287 kV100–161 kVUnder 100 kVVoltage not reported

Longest high-voltage lines

220 kV and above, highest voltage first
BetweenVoltageLengthOwnerState
Singleton345 kV9.8 km Entergy Texas, Inc.TX
Substation names not reported345 kV0.1 km Entergy Texas, Inc.TX
Substation names not reported230 kV58.6 km Entergy Texas, Inc.TX
Amelia Bulk230 kV27.7 km Entergy Texas, Inc.TX
Substation names not reported230 kV25.1 km Entergy Texas, Inc.TX
Bevil – Cypress230 kV21.0 km Entergy Texas, Inc.TX
Amelia Bulk – Helbig230 kV16.6 km Entergy Texas, Inc.TX
Substation names not reported230 kV9.7 km Entergy Texas, Inc.TX
Substation names not reported230 kV9.3 km Entergy Texas, Inc.TX
Substation names not reported230 kV9.3 km Entergy Texas, Inc.TX
Amelia Bulk – Bevil230 kV9.2 km Entergy Texas, Inc.TX
Substation names not reported230 kV7.8 km Entergy Texas, Inc.TX
Substation names not reported230 kV5.5 km Entergy Texas, Inc.TX
Substation names not reported230 kV5.0 km Entergy Texas, Inc.TX
Gulfway230 kV3.8 km Entergy Texas, Inc.TX
Gulfway230 kV3.7 km Entergy Texas, Inc.TX
Substation names not reported230 kV2.6 km Entergy Texas, Inc.TX
Gulfway230 kV2.5 km Entergy Texas, Inc.TX
Substation names not reported230 kV2.5 km Entergy Texas, Inc.TX
Helbig230 kV2.1 km Entergy Texas, Inc.TX
Cow230 kV1.9 km Entergy Texas, Inc.TX
Substation names not reported230 kV1.3 km Entergy Texas, Inc.TX
Substation names not reported230 kV0.6 km Entergy Texas, Inc.TX
Substation names not reported230 kV0.6 km Entergy Texas, Inc.TX
Substation names not reported230 kV0.5 km Entergy Texas, Inc.TX

Line length by state

Click a state to drill down.

Largest owners

By route length in this view. Click to map their lines.

Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues Β· US power plants