United States β€Ί Grid β€Ί Transmission lines

OCTARY USA Β· TRANSMISSION

Tennessee Valley Authority: Transmission lines in the USA

The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.

Line sections2,441mapped segments
Route length21,943 km13,635 mi
345 kV and above3,020 kmthe backbone
Owners1utilities and others

Map

Loading lines…
500 kV100–161 kVUnder 100 kVVoltage not reported

Longest high-voltage lines

220 kV and above, highest voltage first
BetweenVoltageLengthOwnerState
Wilson500 kV198 km Tennessee Valley AuthorityTN
Volunteer – Watts Bar Power Station500 kV151 km Tennessee Valley AuthorityTN
Maury – Browns Ferry500 kV140 km Tennessee Valley AuthorityAL, TN
Phillips Bend – Volunteer500 kV105 km Tennessee Valley AuthorityTN
Maury – Franklin500 kV103 km Tennessee Valley AuthorityTN
Sequoyah – Franklin500 kV101 km Tennessee Valley AuthorityTN
Montgomery – Wilson500 kV92.5 km Tennessee Valley AuthorityTN
Davidson – Johnsonville500 kV91.6 km Tennessee Valley AuthorityTN
Weakley – Lagoon Creek500 kV87.7 km Tennessee Valley AuthorityTN
Bull Run – Watts Bar Power Station500 kV86.9 km Tennessee Valley AuthorityTN
Johnsonville500 kV83.9 km Tennessee Valley AuthorityTN
Sequoyah – Widows Creek 500kv500 kV79.6 km Tennessee Valley AuthorityTN, AL
Sullivan – Phillips Bend500 kV78.2 km Tennessee Valley AuthorityTN
Davidson – Cumberland 500kv500 kV77.3 km Tennessee Valley AuthorityTN
Johnsonville – Gleason500 kV69.7 km Tennessee Valley AuthorityTN
Cordova – Benton500 kV68.0 km Tennessee Valley AuthorityMS, TN
Montgomery – Davidson500 kV66.1 km Tennessee Valley AuthorityTN
Watts Bar Power Station500 kV63.7 km Tennessee Valley AuthorityTN
Sullivan – Nagel500 kV63.4 km Tennessee Valley AuthorityTN
Montgomery – Cumberland 500kv500 kV62.1 km Tennessee Valley AuthorityTN
Browns Ferry – Madison500 kV60.2 km Tennessee Valley AuthorityAL
Shelby – Lagoon Creek500 kV56.9 km Tennessee Valley AuthorityTN
Sequoyah – Watts Bar Power Station500 kV55.7 km Tennessee Valley AuthorityTN
Johnsonville – Cumberland 500kv500 kV53.5 km Tennessee Valley AuthorityTN
Cordova – Aurora500 kV47.0 km Tennessee Valley AuthorityTN

Line length by state

Click a state to drill down.

Largest owners

By route length in this view. Click to map their lines.

Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues Β· US power plants