United States β€Ί Grid β€Ί Transmission lines

OCTARY USA Β· TRANSMISSION

Avista Corp: Transmission lines in the USA

The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.

Line sections316mapped segments
Route length3,036 km1,886 mi
345 kV and above0.1 kmthe backbone
Owners1utilities and others

Map

Loading lines…
500 kV220–287 kV100–161 kVUnder 100 kVVoltage not reported

Longest high-voltage lines

220 kV and above, highest voltage first
BetweenVoltageLengthOwnerState
Coyote Springs500 kV0.1 km Avista CorpOR
Noxon230 kV112 km Avista CorpMT
Moscow230 kV71.5 km Avista CorpID
Noxon – Pine Creek230 kV69.3 km Avista CorpID, MT
Benewah – Pine Creek230 kV68.9 km Avista CorpID
North Lewiston – Shawnee230 kV55.5 km Avista CorpID, WA
Benewah – Rosalia230 kV51.7 km Avista CorpID, WA
Dry Gulch230 kV48.3 km Avista CorpWA
Cabinet Gorge230 kV46.1 km Avista CorpID
Rosalia – Shawnee230 kV44.9 km Avista CorpWA
Substation names not reported230 kV42.1 km Avista CorpID, WA
Beacon – Rathdrum230 kV40.8 km Avista CorpID, WA
Rathdrum230 kV38.0 km Avista CorpID
Noxon – Cabinet Gorge230 kV29.8 km Avista CorpMT, ID
Rathdrum230 kV25.9 km Avista CorpID, WA
Beacon230 kV19.3 km Avista CorpWA
Dry Gulch – Lolo230 kV18.2 km Avista CorpID, WA
North Lewiston – Dry Gulch230 kV12.5 km Avista CorpID, WA
Bell – Beacon230 kV10.0 km Avista CorpWA
Bell – Beacon230 kV9.7 km Avista CorpWA
Beacon230 kV2.0 km Avista CorpWA
Substation names not reported230 kV0.9 km Avista CorpWA
Rathdrum230 kV0.5 km Avista CorpID
Rathdrum230 kV0.5 km Avista CorpID
Noxon230 kV0.4 km Avista CorpMT

Line length by state

Click a state to drill down.

Largest owners

By route length in this view. Click to map their lines.

Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues Β· US power plants