Solar + storage project 1024, Cache County

Solar + storage project 1024, Cache County is a 100 MW solar + storage request withdrawn in the West interconnection queue, in Cache County, Utah, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2018 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1024
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Bridgerland-Green Canyon transmission line
Location
Cache County, Utah
Technology
Solar: 100 MW Β· Battery
Total requested
100 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN - LACK OF READINESS
Queue status
Withdrawn
Entered queue
10 May 2018
Proposed online date
December 2020

Location

Marker shows the centre of Cache County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah

Other requests in Cache County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem